Direct Answer: AB 956 was signed September 29, 2026 and takes effect January 1, 2027. It requires cities to ministerially approve two detached new construction ADUs on a lot with a proposed or existing single-family dwelling.
You finally got a client to commit to a backyard unit, and now the rules changed underneath you. Starting January 1, 2027, a California lot with a proposed or existing single-family home can get two detached new construction ADUs approved ministerially instead of one.
For Berkeley, Oakland, and the rest of the East Bay, where deep lots behind pre-1940 houses are common, that is a real shift. The approval side gets simpler. The material side roughly doubles.
Here is the position we will back up below: on a two-unit lot, the smart move for most projects is to spec both units the same wherever the design allows, and to lock the long-lead items (interior doors, custom trim profiles, engineered beams) before framing starts. The permit is no longer the thing that sets your schedule. The millwork is.
What the California two detached ADUs law AB 956 actually changes
Governor Newsom signed Assembly Bill 956 on September 29, 2026, Chapter 791, Statutes of 2026. It was authored by Assemblymember Sharon Quirk-Silva and sponsored by California YIMBY, and it passed the Senate 27-6 and an Assembly concurrence vote 46-0 before reaching his desk.
State law already required local agencies to ministerially approve one detached, new construction ADU that does not exceed 4-foot side and rear yard setbacks on a lot with a proposed or existing single-family dwelling. AB 956 amends Government Code 66323 to double that by-right allowance to two detached ADUs. It also broadens state limits on HOA rules and private covenants that restrict ADUs.
The effective date is January 1, 2027. Senate Bill 1117 was signed the same day and makes its own changes to ADU law, so read both before you set a client’s expectations. You can track the bill history on the CalMatters Digital Democracy page for AB 956, and the law firm Best Best & Krieger published a plain summary of the change in October 2026.
A few things it does not do:
- It does not waive building code, Title 24, or structural engineering
- It does not override local fire zone requirements on your property
- It does not promise approval on timelines, only ministerial review of the application
For what applies to a specific Berkeley parcel, including fire zone and defensible space rules, check with the City of Berkeley or your local fire department.

Two units on one lot means two of almost everything
The part that catches people is how fast a second detached unit multiplies the small stuff. Framing lumber and sheathing scale in an obvious way. Millwork does not feel obvious until you are standing in the yard counting casing sets.
A modest one-bedroom detached unit usually carries more interior doors than clients expect once you count the bedroom, bathroom, closet, and any utility or mechanical door. Double that for two units and you are placing a real door order, not picking up a few slabs.
What doubles on a two-ADU lot:
- Interior door count, plus hardware sets in a matched finish
- Casing and base footage, calculated per opening and per wall run
- Siding square footage and the exterior trim that goes with it, including corners, water table, and fascia
- Engineered beams and headers, built to the engineer’s specification for each structure
- Fasteners and flashing, which people routinely underbuy on the second unit
Cost drivers follow the same pattern. On doors, the spread between hollow core and solid core, between slab and prehung, and between stock and custom sizing moves the number more than brand does. On trim, it is species, profile complexity, and whether the profile is stock or has to be run to match a sample.
If you want a category-by-category starting list, we walked through it in our piece on planning an ADU in Berkeley or Oakland.
Why we would spec both units identically
Here is where we will plant a flag. When a lot gets two detached units, the default should be one specification for both unless there is a concrete reason to split them.
The reasons are practical, not aesthetic:
- One trim profile, one run. Running the same casing and base for both units means one lot of material with consistent milling and color. Two separate orders months apart can come from different lots.
- One door schedule. Same jamb width, same swing conventions, same bore and backset means fewer field surprises and fewer re-ordered slabs.
- One hardware finish. Mixing finishes across two units on the same property creates punch list arguments later. Emtek and Baldwin both offer broad finish lines, but finishes read differently across product families, so pick once.
- Fewer ordering mistakes. Most of the rework we see on multi-unit residential comes from a detail that changed between unit A and unit B and nobody wrote it down.
When this does not apply: if one unit is a long-term rental and the other houses family, the use case can justify different door construction or different hardware. And if one unit sits tight against the main house where the 1920s casing profile is visible from the same sightline, matching the historic profile on that unit only can be the right call. Bring us a sample and we can talk about reproducing it.
The other reason to settle the spec early is timing. If your plan check goes smoothly under the new two-round plan check limit starting in 2027, your permit may land faster than your custom door order.
What to decide before you order for a two-unit lot
A quick reference for the three material categories that cause the most rework when a second unit enters the picture.
| Category | What doubles | Decide before ordering |
|---|---|---|
| Interior doors | Door count, jambs, hardware sets | Solid core vs hollow core, slab vs prehung, jamb width for 2×4 or 2×6 walls, swing direction, bore and backset |
| Moulding and trim | Casing sets, base footage, exterior trim | Species, stock profile or matched to a sample, primed or paint grade, finish schedule |
| Siding and exterior trim | Square footage, corners, fascia, water table | Cedar, redwood, or fiber cement, exposure, clearance to grade, back-priming plan |
| Engineered lumber | Beams, headers, joists for both structures | Engineer’s specification per unit, exposed or concealed, delivery access and staging |
The ordering sequence for a two-ADU lot
A simple order of operations so the long-lead items do not become the thing holding up your framing crew.

Siding and exterior trim: two buildings, two microclimates
Two detached units on the same lot can face very different conditions. A unit tucked behind the main house in the fog-belt flats of West Berkeley stays damp long after a sunny hillside unit in the Oakland hills has dried out.
The failure point is almost always the same. Water gets behind the bottom course or sits where siding meets grade, and the bottom two feet go soft years before the rest of the wall shows anything.
What we would watch on a two-unit backyard build:
- Clearance to grade. Backyard units often get built to a lower finished grade than the main house, and the bottom course ends up too close to soil or paving.
- Back-priming and six-side finishing. Every face, both edges, and both ends. This matters more in a fog pocket than almost anything else you can do.
- Species and product choice. Cedar and redwood behave differently from fiber cement in sustained moisture, and the right pick depends on exposure, finish plan, and maintenance expectations.
- Drainage around the new footprints. Two new roofs mean two new sets of downspouts dumping water somewhere it did not go before.
With forecasters signaling a strong El Nino heading into winter 2026-27, the sensible read is not that a specific rainfall total is coming. It is that storm sequences hit the Bay Area every winter and a backyard unit under construction has no gutters yet.
Our moulding, trim, and siding department can walk through the options for both units at once so the exterior reads as one project.
The two places two-unit orders go sideways
Engineered lumber. We supply beams, headers, and joists built to the specification your project’s engineer provides. We do not size them, and no supplier should. Sizing belongs to your engineer or the manufacturer’s sizing software.
What speeds up the order on our end:
- The engineer’s spec or the relevant plan sheet, per unit
- Whether the member is exposed in a ceiling or concealed in a wall, since that changes the product conversation
- Length, depth, and ply count as specified
- Site access and staging, because two units mean two drops
Detail on products and how orders are placed is on our engineered lumber and beams page.
Interior doors. The second common snag is door fit. Older Berkeley openings are rarely standard, and crews building a new ADU sometimes carry main-house assumptions into new framing. Custom sizes, cut-and-reblock work, matched preparations, and lock prep all run through our in-house door shop, and that work takes calendar time. The interior door and hardware page covers slab versus prehung and the hardware lines we carry.
Frequently Asked Questions About AB 956 and Two Detached ADUs
When exactly does the two detached ADU rule start?
January 1, 2027. AB 956 was signed on September 29, 2026 as Chapter 791, Statutes of 2026.
Does this apply to any lot, or only single-family lots?
The by-right allowance applies to a lot with a proposed or existing single-family dwelling, which is the same condition that already applied to the single detached ADU rule. AB 956 doubles the count to two. Your local planning department is the right place to confirm how it reads on your specific parcel.
Can my HOA still block a second detached ADU?
AB 956 broadens the existing state limits on HOA rules and private covenants that restrict ADUs. That does not mean every restriction disappears, so have the actual covenant reviewed rather than assuming.
Will building two units at once save money on materials?
Ordering once for both units usually helps more than people expect, mostly by cutting duplicate deliveries, reducing short orders, and keeping trim and siding from a single lot of material. Actual cost still depends on species, door construction, custom work, and lead times, so get a real takeoff priced rather than doubling a one-unit number.
How early should I order doors and custom trim?
Earlier than feels necessary. Custom door sizing, matched profiles, and specialty hardware finishes all run on lead times that do not shrink because your permit came back fast. We would have the door schedule and trim profile settled before framing is done on the first unit.
Planning two backyard units for 2027?
If you are drawing up a two-ADU lot in Berkeley, Oakland, or anywhere in the East Bay, our yard staff can help you build out the trim, siding, and engineered lumber side of the takeoff before the first order goes in. The Lumberyard and Hardware at 642 Hearst Avenue is reachable at 510-841-0511, and the Windows and Doors showroom at 1831 Second Street handles interior door and hardware questions at 510-649-4400. Truitt & White has been supplying Bay Area projects since 1946, and we are glad to look at your plans whenever you are ready.